Greater Lansing

Warehouse & industrial facility maintenance

The list is eleven items long because none of them was ever worth a call-out on its own.

What is actually wrong

A working building breaks differently from an empty one. The damage is repetitive and mechanical rather than domestic: dock door panels and bottom sections taken out by a trailer, bollards knocked out of plumb, guard rail and corner protection bent by a forklift, pedestrian-aisle lines worn through, man-doors that have been kicked open ten thousand times, racking uprights with a bend in them, roof leaks over a rack line that nobody can reach during a shift.

None of it stops production on the day it happens, which is exactly why it accumulates. Each item is too small to call a contractor out for on its own, so it goes on a list, and the list is still there a year later with eleven things on it. By then the dock door is a seal problem and a heating bill, the bent upright is a structural question, and the worn aisle line is the thing a safety audit writes up.

The other half of it is that the building is not empty while any of this is fixed. There are people, forklifts and moving stock in the same space, and the repair has to fit into shift patterns, a shutdown week, or a weekend — because an hour of a line down usually costs more than the entire repair.

Where this stops

When it is not a handyman job

This is at the top of the page rather than the bottom because getting it wrong costs you a wasted visit. Insured, and no contractor license is claimed or implied — the Michigan residential builder license is not held.

  • THE 1910 / 1926 LINE IS NOT OURS TO MOVE, AND IT CHANGES THE JOB. Your building operates under OSHA’s general industry standards, 29 CFR 1910. But “construction work” is defined at 1910.12(b) as construction, alteration and repair, including painting and decorating — so the moment a contractor starts altering or repairing the fabric, that work can fall under the construction standards at 29 CFR 1926 instead, even though the building around it has not changed. The practical consequence is not paperwork: the fall protection trigger is four feet under 1910.28 and six feet under 1926.501, and the two rule sets differ on scaffolds and ladders too. Routine servicing tends to stay general industry; a replacement or an alteration tends to become construction. Where an item is genuinely on the line, we will say so in the quote and price the stricter reading rather than the cheaper one.
  • LOCKOUT/TAGOUT IS A TWO-WAY DUTY AND MOST BUILDINGS GET IT BACKWARDS. Under 1910.147(f)(2) the on-site employer and the outside employer have to inform each other of their respective energy control procedures — it is mutual, not a form we sign. If a job touches anything that has to be isolated, we need your procedure before the day, and you get ours. Where a task needs an isolation your team has not authorized, it does not happen that visit.
  • NO ELECTRICAL LICENSE IS HELD. Electrical is like-for-like replacement of an existing fitting on an existing circuit. Anything in a panel, any new circuit, three-phase, machine power, conveyor controls or anything on the incoming service is a licensed electrical contractor’s work, named on the quote and referred out rather than absorbed.
  • NO MECHANICAL, NO PROCESS EQUIPMENT, NO RACKING CERTIFICATION. Mechanical work is not offered at all — that covers heating and cooling plant, compressed air, process equipment and production machinery. A bent racking upright gets reported and photographed, not straightened — racking repair and reinspection is a specialist discipline with its own engineering sign-off, and a repaired upright that has not been assessed is a worse outcome than a flagged one.
  • NO CONFINED SPACE ENTRY, NO HOT WORK ON YOUR PERMIT. Neither is offered. If an item needs either, it is outside what this company takes, and it is better to know that at quote stage.
  • NO SAFETY PROGRAM IS BEING SOLD HERE. This is a trades contractor describing the rules it has to work to inside your building. It is not a consultancy, it does not write your energy control program or audit your site, and nothing on this page is advice on your own compliance.

The work itself

What actually gets done

Scheduling against your production calendar rather than ours — nights, weekends, changeovers and shutdown weeks — and saying at quote stage which items genuinely cannot be done around a running operation.

Working the accumulated list in one mobilization instead of one visit per item, which is where most of the saving on this kind of work actually comes from.

Dock and door fabric: man-doors, frames, closers, hardware, weather seals, light panels and the carpentry around an opening.

Impact damage repair — bollards reset, guard rail and corner protection replaced, wall and column protection made good where a truck has found it.

Floor and aisle marking repainted, and the surface prep that makes it last longer than the next quarter.

Interior fabric in the office and welfare side of the building: drywall, ceilings, paint, floors and doors, which is ordinary work that happens to sit inside a plant.

Treating the paperwork as part of the job — a certificate of insurance naming your entity, a W-9, a method statement where your site requires one, and a sign-in to your contractor induction like anyone else.

This work sits inside General Repairs, which carries the invoiced price bands for the trade with the sample size printed beside every figure.

What it costs

There is no price list for this, and here is what actually decides the number.

The same three words describe a twenty-minute job and a two-day one. Rather than publish a figure that is wrong for one of them, here is what moves it — so you can work out roughly which end of it you are at before anybody comes out.

When it can be done. The same work on a Saturday during a shutdown is not the same price as a Tuesday morning, and on some sites there is no Tuesday morning option.

How much of the building has to keep running around it. Barriers, banksman cover and clean-down between shifts are real hours.

Whether the work counts as maintenance or as construction under OSHA, because that changes the fall protection trigger, the equipment and the time. See the boundaries below — it is not a judgment call we get to make for pricing convenience.

Working height, and whether there is a clear floor under it. Anything over a live rack line or a conveyor is a different job from the same repair over an empty bay.

How many items are on the list. Eleven items in one mobilization is substantially cheaper per item than eleven call-outs, and this is the single biggest lever on this kind of work.

Whether you are supplying the materials. Many operations already stock their own dock hardware, guard rail and line paint, and where that is true this becomes a labor quote.

How to get a real number

Somebody comes out, looks at it properly, and you get a fixed price in writing with the work set out line by line and the exclusions written down as plainly as the inclusions. Coming out to do that is not charged for, and neither is working out what is wrong. If something is found once a wall or a floor is open, it is priced as a written change order and you decide before the work carries on rather than after it is billed. Materials are supplied at cost with the receipt attached, first-time customers get 10% off labor, and labor carries a one-year craftsmanship warranty.

If this is happening right now

What to do in the next five minutes, and what happens when you ring.

Before anybody arrives

  • Walk the list once with a phone and photograph every item, including the ones that have been there so long nobody sees them. A photographed list of eleven items gets a usable quote; “some dock damage and a few doors” gets a site visit first.
  • Write down the access reality before you call: shift pattern, whether there is a shutdown week coming, who runs contractor induction, and what your site requires before anyone is allowed on the floor.
  • Say which items sit over a live aisle, a rack line or a conveyor, and which are over an empty floor. That single distinction moves the price more than anything else on the list.
  • Find out whether any item needs an isolation, and who on your side is authorized to do it. That is the 1910.147(f)(2) conversation and it is much cheaper to have in advance.
  • If a dock door or a man-door is the problem, measure the opening and photograph the maker’s plate. Door hardware is a parts-lead-time job far more often than it is a labor job.
  • Send your insurance and induction requirements at the start. Adding an endorsement takes days, and discovering it on the morning of a shutdown weekend is how a shutdown slot gets wasted.

Call the business line

(517) 505-7135

Answered Monday to Friday, 08:00 to 18:00. There is no out-of-hours line and this page is not going to invent one — outside those hours, leave a message with the address and what is happening, and it is picked up in the morning.

On the call you get asked what is happening, what else in the building is affected, and whether it is still getting worse. That is how it gets decided whether this is our job at all — and if it is not, you get told that on the phone rather than after somebody has driven out.

  • No trip charge
  • No call-out fee or minimum
  • No diagnostic fee
  • No charge for a return visit

True across all 84 written quotes this company has issued. Most contractors in this market charge to turn up.

Or send the details

When the right answer is not this company

You can smell gas
Leave the building and call the utility from outside. Not us, and not later.
Water you cannot stop
Your main shut-off first, then a licensed plumber. Every minute of this one costs money.
Sewage backing up, or several fixtures at once
A licensed plumber with a camera. That is the shared line, not a fixture, and a cable down one sink will not touch it.
Sparking, scorching or a burning smell at an outlet or a panel
Breaker off, and a licensed electrician. Electrical work here is repair and like-for-like replacement, and this is neither.
No heat, or heating and cooling equipment that has failed
A licensed mechanical contractor. That trade is not offered here at all, and knowing that in one phone call is worth more than a visit.

Questions people actually ask

Have you worked in a warehouse or plant before?

Not yet as a direct industrial contract, and this page would be easy to write as though we had. What sits behind it is the same repair work done every week for commercial property managers and two national facilities networks, plus café, shop and public-building work in occupied spaces. The trades are identical; what is new is the setting and the rules that come with it. If a reference from a commercial client would help, ask and you will get one.

Our site requires OSHA training before anyone sets foot on the floor. Do you have it?

Ask us for the current position when you enquire rather than relying on a web page for it, because training records change and a stale claim on a website is worse than no claim. What we will not do is turn up and work out on the morning that somebody cannot be inducted — send your requirement with the enquiry and you will get a straight yes or no before anybody is scheduled.

Why does it matter whether a job is “maintenance” or “construction”? It is the same repair.

Because the two sit under different OSHA rule sets and the practical requirements differ. The clearest example is working height: general industry requires fall protection from four feet, construction from six, and the scaffold and ladder provisions are not identical either. Replacing a worn dock seal is servicing. Taking out a door assembly and fitting a different one is an alteration, and alteration is named in the definition of construction work. It changes the method, sometimes the equipment and sometimes the hours — which is why it belongs in the quote rather than being discovered on the day.

Can you work while the building is running?

Usually, and most of this work is that. It changes sequencing more than price — hard barriers rather than tape where forklifts move, nothing left out across a shift change, and clean-down at the end of each visit instead of the end of the job. Items over a live aisle or a conveyor are the exception and those get scheduled into a quiet window and priced that way. The quote says which is which rather than leaving it to the day.

Do you do planned maintenance contracts, or only call-outs?

Both are possible and the quarterly walk is usually the better arrangement for a building like this, because the failure mode here is accumulation rather than any single breakage. What we will not do is sell a contract priced off a building nobody has walked. The first job is a real list of real items; a recurring arrangement is a conversation worth having after that, with figures from your own building behind it.

Who is responsible for safety on the floor — us or you?

Both, which is the honest answer and the one the multi-employer rules assume. You control the site, the hazards in it and who is authorized to isolate what. We are responsible for our own people, our own methods and for working to whichever standard governs the task. The part that is genuinely shared is information: your procedures and hazards to us before the day, ours to you. Where that exchange has not happened, the work does not start.

Send us the list

Photograph every item, including the ones that have been there long enough to stop being visible. Tell us your shift pattern and whether a shutdown week is coming, mark which items sit over a live aisle or a conveyor, and say which need an isolation and who on your side is authorized to do it. Send your induction and insurance requirements with the enquiry rather than on the morning — that is the usual way a shutdown slot gets wasted.