Most bathroom remodel pricing you find online is a national average with a $9,000 spread. That is not much use when you are standing in your own bathroom in Lansing trying to work out whether you can afford it. So here is one real job, start to finish, with the actual contract figure and the one thing that changed halfway through.

What does a full bathroom gut actually cost in Lansing?

This one came to $17,500.68 in labour. That was a complete gut and rebuild of a single full bathroom in a Lansing home, run daily from late July into early September 2026, with the homeowner buying all materials separately.

The contract covered demolition back to the studs, rebuilding the tub wall, new fixtures set and plumbed, tiling, finish carpentry, paint, and a set of window replacements and door and lock work in the same property while we were on site. One lead carpenter worked it as his primary job for the duration rather than dipping in between other calls.

Your bathroom will not cost exactly this. A powder room is a fraction of it; a job that stays cosmetic and never opens a wall is far less. But this is what the full version looks like when the number is real and nothing has been rounded off to make it look tidier.

What does “labour only” mean, and why does it matter?

Labour only means our contract covers the work, and you buy the materials yourself. On this job the homeowner purchased every tile, fixture, vanity and window directly.

Homeowners are often surprised this is an option, and for the right client it is the better one. You choose exactly what goes in, you pay the retail price with no contractor markup on top, and you keep the receipts and the warranties in your own name. If a vanity arrives damaged, you deal with the supplier directly instead of waiting on us to do it for you.

The trade-off is that you are managing the buying. Materials need to be on site before the crew needs them, or the job stalls with people standing around. On this project that co-ordination worked because the homeowner stayed on top of ordering — when a mirror arrived cracked, they handled the exchange while we carried on with other work.

If you would rather not manage any of that, we will quote materials and labour together instead. It costs a little more and it removes the homework.

Why did the price change partway through the job?

We opened the wall behind the tub and found rotted studs, which added $1,000 to the contract as a written change order. That figure is included in the $17,500.68 above.

This is the part most contractors will not put in writing on a public page, so here is the honest version. On a gut, nobody — not us, not a home inspector, not the most experienced builder in Ingham County — can tell you with certainty what is behind a finished wall until it comes off. Bathrooms hide water damage particularly well. A slow leak behind a tub surround can run for years, soaking the framing while the tile face above it looks perfect.

When that wall came open, the studs behind the tub had gone soft. There is no version of this job where we tile back over rotted framing. It had to be cut out and rebuilt before anything else happened.

What matters is how that gets handled:

  • Stop and show the client. Photographs of the actual framing, before anything is covered up.
  • Price it separately and in writing. Change Order No. 1, scoped and costed on its own, not folded quietly into the running total.
  • Get approval before continuing. The client decides. They are paying for it.

A change order is not a contractor moving the goalposts. It is the correct response to a condition that could not be seen when the job was priced. What should worry you is the opposite: a contractor who finds rot and says nothing, or one whose “fixed price” quietly absorbs it by cutting corners somewhere you will not look.

Ask any contractor bidding your bathroom what happens if they open the wall and find damage. If they tell you that never happens, keep calling.

How long does a full bathroom gut take?

About six weeks of working days on this job, from demolition to final walk-through. That is not six weeks of continuous swinging hammers — it is the real elapsed time once you account for how a bathroom is actually built.

Bathrooms are slow for reasons that have nothing to do with effort. Work happens in a strict order: demo, then framing repairs, then rough plumbing and electrical, then board, then tile, then fixtures, then finish. Several of those steps have to cure or set before the next can begin. Thinset and grout do not care about your schedule.

Anyone quoting you a full gut in a week is either not doing a full gut or is planning to skip a cure time. Both show up later.

How are payments usually structured on a job this size?

In three stages, tied to progress rather than to dates. On this project it ran roughly 40% at signing to mobilise and get the crew committed, a progress payment once demolition and rough-in were complete, and the balance at the final walk-through.

That last point is the one to hold on to. The final payment is due at the final walk-through, not before it. You walk the finished room with the contractor, you list anything that is not right, and the balance changes hands when you are satisfied. Any contractor who wants the full amount before you have inspected the work is asking you to give up your only real leverage.

What pushes a bathroom job higher or lower?

The variables that actually move the number, in rough order of impact:

  • Moving plumbing. Keeping the toilet, tub and vanity where they are is dramatically cheaper than relocating them. Moving a drain means opening the floor.
  • What is behind the walls. Rot, failed subfloor, old galvanised supply lines and undersized wiring all add scope that cannot be seen at quote time.
  • Tile choices. Large-format tile, mosaics, herringbone and anything requiring a mud bed take substantially longer to set than a straightforward subway run.
  • House age. Older housing stock around Lansing and East Lansing frequently hides plaster, knob-and-tube remnants and framing that is not on a modern 16-inch layout.
  • Scope creep in your favour. On this job the windows and door work were bundled in while we already had a crew on site, which is nearly always cheaper than bringing someone back for a separate trip.

Frequently asked questions

Is $17,500 normal for a bathroom in the Lansing area?

For a complete gut and rebuild with framing repairs, it is a realistic figure. Cosmetic refreshes — new vanity, new fixtures, paint, existing tile left alone — land far below it. The gap between those two jobs is much wider than most homeowners expect, which is why a walk-through matters before anyone quotes a number.

Do you charge for the estimate?

No. We walk the space, talk through what you want, and put a written quote together at no cost.

What if you find something unexpected in my bathroom?

You get photographs, a separately priced written change order, and a decision to make before we carry on. Nothing gets added to your bill that you have not seen and approved first.

Can I supply my own materials?

Yes, and plenty of clients do. You avoid markup and keep the warranties. You do need to keep ahead of the schedule so materials are on site when the crew needs them.

Which areas do you cover?

Haslett Handyman Company works throughout Greater Lansing — Lansing, East Lansing, Okemos, Haslett, Holt, Mason, Williamston, DeWitt, Grand Ledge and Dimondale.

Thinking about your own bathroom?

The most useful thing we can do is come and look at it. A walk-through costs nothing, takes about half an hour, and you will get a written quote with the scope spelled out rather than a number over the phone that changes once someone actually sees the room.